Solutions
Industry Solutions
AI-powered solutions for clean energy, smart cities, telecom infrastructure, and precision agriculture

A 90 kW industrial solar PV + 1,030 kWh storage system in Mexico delivers 150,719 kWh/year at 19.1% capacity factor, with $97,218 turnkey PV cost and $226,600 storage. It achieves $0.023/kWh LCOE, $13,614 annual savings, 7.1‑year payback, and $252,769 lifetime savings while avoiding 63.3 tons CO₂/year.

A 21-tower, 45 m, 500 kV dead-end steel lattice transmission system in Lusail, Qatar is delivered by SOLAR TODO at $3,577,072 turnkey, with $2,325,097 FOB and $2,861,657 CIF options, achieving $715,414 annual savings, a 5-year payback, 400 m spans, and 50-year IEC 60826-compliant design life.

Case study of a 2,580-unit SOLAR TODO solar streetlight project in Milan’s highland zone: 30W, 4,500 lm poles with 7-day autonomy and 1,490 Wh LFP batteries. Turnkey cost is $608,550, delivering 706,275 kWh and 353,138 kg CO₂ savings per year with an 8.6-year payback over a 12-year lifespan.