AI-powered solutions for clean energy, smart cities, telecom infrastructure, and precision agriculture

Verified SOLAR TODO case study for Ho Chi Minh City: 35 grid-powered smart streetlights over 1,000 m, with 10 m poles, 525,000 lumens, and exact pricing of $94,241 FOB, $115,989 CIF, and $144,986 turnkey.

A 15 m, 110 kV FRP composite power transmission pole from SOLAR TODO is offered at $2,099 FOB, $2,631.3 CIF, and $2,302 turnkey installed. The 134 kg pole supports ACSR‑240 conductors, Class 2 (30 m/s) wind, 1.3 kN wind load, and 9.7 kN·m bending moment with a 40‑year design life.

A 25 m FRP 110 kV transmission tower project using 212 composite poles shows FOB $294,430, CIF $362,375, and turnkey $452,969. Designed for 200 m spans and 30 m/s wind, it delivers $22,648/year O&M savings and a 20-year payback over a 40-year design life, relevant to Atlanta utilities.

A 25 m, 330 kV hybrid steel-FRP power transmission pole in Gothenburg is offered at $3,120 turnkey, with $2,028 FOB and $2,496 CIF. The 357 kg structure supports a 200 m span, 30 m/s wind, and 40-year life, delivering a 6.5-year payback and $480/year maintenance savings versus conventional towers.

Asia Pacific enterprise security case: 128 zones, 760 devices with 10.4 kW solar and 103.8 kWh LFP storage. Three-tier pricing—$21,145 FOB, $26,024 CIF, $32,530 turnkey—delivers 72-hour autonomy, 0.7-year payback, and $51,627 annual savings for integrated alarm and surveillance.

SOLAR TODO’s Telecom Tower in Global — $526,480 Turnkey delivers 100 hybrid composite poles at 35 m with 6 panel antennas and 2 microwave dishes per tower. FOB and CIF are both $0, with Class 1 wind rating, direct-embed foundations, and full safety accessories for low-corrosion environments.

SOLAR TODO’s 7 m, 40 W solar streetlight system deploys 2,859 poles with 6000 lm output, 2 days autonomy, and 1,043,535 kWh/year savings. Verified pricing is FOB $588,954, CIF $664,340, and turnkey $759,067, delivering $125,224 annual savings and a 4.9-year payback over a 12-year design life in temperate climates.

Verified SOLAR TODO case: a 25 m FRP composite power transmission pole for 110 kV, class_2 wind and 200 m span is supplied globally at exactly $2,829 turnkey per structure, with FOB $0 and CIF $0, providing a clear benchmark for utilities and EPCs planning sub-transmission upgrades.

SOLAR TODO’s 30 m, 110 kV single‑circuit steel power transmission tower for a 100 m span in wind class 2 is delivered at a verified turnkey price of $25,009 per tower, with FOB and CIF both $0. This case study explains configuration, three‑tier pricing, and procurement use.

A 90-unit SOLAR TODO Solar Streetlight project in Global delivers 30W LEDs on 6m poles with mono PERC panels and LFP batteries at a fixed $15,806 turnkey price. FOB and CIF are $0, with local motion/timer/dimming controls optimized for temperate climates and off-grid operation.

A subtropical municipality deployed 568 SOLAR TODO solar streetlights (30W LED, 50W mono PERC, 450Wh LFP) for $82,370 turnkey, achieving 155,490 kWh annual savings, 77,745 kg CO₂ reduction, and a 5.3-year payback over a 12-year system lifespan with 6m galvanized poles at 18m spacing.

A 5.6 km SOLAR TODO smart streetlight corridor with 188 grid-powered poles (12 m, 200 W LEDs) delivers 5,640,000 lm and consumes 353,393 kWh/year. With $817,499 turnkey CAPEX and $93,387 annual OPEX, it integrates 8 smart modules per pole and achieves 20% energy savings vs traditional lighting.